For home renovation, it is not an easy task. We can't ignore these for the decoration design of the room. We take the decoration of the bathroom, we must not ignore it. The installation of the corresponding sanitary ware is especially careful. For the bathroom, it is indispensable in our life. The quality of the installation not only affects the aesthetics of our decoration, but also affects the comfort we use. The following small series will give a detailed introduction to the installation of sanitary ware. Sanitary ware installation guide Raiders five steps to get Bathtub installation The first step: you need to test the water to see if there is any leakage: before we put the bathtub, we need to install the corresponding water fittings, and we need to do a good job of closing the water for 24 hours, then look at the leak of the bathtub. Especially pay attention to the overflow. The second step is to level the bathtub. When we are installing the bathtub, we must pay attention to the corresponding water outlet is lower than the inlet end, so as to avoid the poor discharge. The corresponding bathtub should not only be visually level, but also pay attention to not affect the drainage. The third step: sand filling, compared to the cast iron bathtub, is strong but the thermal conductivity is very fast, so it is necessary to use the Zhonghe sand for bottoming. Of course, foam can also be used because the foam does not have fluidity. It is also necessary to pay attention to the fact that the sand cannot leak into the downpipe when filling the river sand. The fourth step: check and repair. When installing, we also need to pay attention to the 300mm wide and 400mm holes in the water outlet, and waterproof and anti-corrosion treatment according to the size. The purpose of this is to have a good mouth in the future when we are doing maintenance. Toilet installation The first step: we need to take out the pipe plug of the ground drain, and then need to check if there are any debris in the pipe, and if necessary, the corresponding debris needs to be removed. Then clean the circumference of the nozzle, and then connect the corresponding outlet of the toilet to the lower water outlet to make it level and correct. Then we need to mark the bolt holes in the toilet. The second step: punch holes. Corresponding holes of 20 mm in diameter and 60 mm in depth are required at the corresponding stamps. Then insert the bolt into the hole, then use cement to secure it and align the toilet eye with the bolt. Then, the putty is applied around the corresponding water outlet of the toilet and the lower water pipe mouth, and the corresponding four bolt holes of the toilet are screwed until the tightness is moderate. Step 3: Install the rear center of the toilet. It should be installed according to the corresponding drawings or the lined part, and the relevant bolts need to be fixed. The degree of fixing needs to be moderate and not too tight. Step 4: Install the back water tank. When installing the water tank, we need to pay attention to the moderate size, not too loose or too tight. Step 5: Pick up the water. The installation of the water supply system also needs attention, and it is impossible to leak water. Pay attention to the tightness of the tightness when you receive the water. Washbasin installation The first step is the installation of the washbasin: when we are installing the pipe rack, we must first draw the line of the lower water pipe, then measure the height of the ground upwards, and draw a horizontal line on the wall. Mark the mark according to the width of the washbasin, and then make a 120 mm deep hole. Clean up the relevant debris and keep the installation parts clean. The second step is the installation of the cast iron washbasin: as with the above installation, it is also necessary to mark the center of the lower water pipe, then measure the height, and draw horizontal lines to form a cross. According to the width of the washbasin and then mark on the center line, and the pot holder is placed, the position of the screw hole is reserved, and the size needs to be marked.
Dosing and Metering Pumps Characteristic :
1 Clean and pollution-free: fluid only passes through and touches the Peristaltic Pump hose.
Dosing And Metering Pumps,Programmable Peristaltic Pump,Water Treatment Pump,Laundry Detergent Pump Baoding Chuangrui Precision Pump Co., Ltd. , https://www.crprecisionpumps.com
3. Low shear force: It is an ideal tool for conveying shear-sensitive and corrosive fluids.
4. Corrosion resistance: it can transport various fluids, such as organic solvents and corrosive liquids.
5. Idling and dry operation: air or gas-liquid-solid three-phase mixed transportation can also be transported.
6. Possess self-priming ability: self-priming, no need to fill the pump, no need to empty.
7. It has the function of a shut-off valve, does not siphon, has no seals, and has the functions of a shut-off valve and a check valve.
8. Two-way conveying function: reverse pumping and back-suction functions can be realized by changing the direction of the pump runner.
9. Simple maintenance: only need to replace the peristaltic pump hose, no valve and seal replacement.