Want to renovate the decoration before the renovation must be completed in advance

Recently, there have been consumer consultations, new homes are in a hurry to stay, and now they are going to renovate. Can they be renovated before? The industry insiders said that due to the early Spring Festival this year, plus the decoration workers are on holiday, the renovation is now starting, the construction time is only about 40 days. In 40 days, the decoration is completed. In addition to preparing the materials and design drawings, the consumers also need to link the progress of the main materials, strictly grasp the time, and cross-work if necessary.

â–  Must-have

Heating equipment at the construction site

Construction must obtain permission for the property. If there is no one to live in the new house, it can be directly constructed. The house must have heating or heating equipment. Because the winter is cold, the decorator is very cold all day in the unheated room, and the wall paint is very slow because it is dried at low temperatures.

Tip: For some old houses, the residential property may have regulations that do not allow construction noise on Saturdays and Sundays. For this situation, Liu Yanjun, manager of Yuanzhou Decoration Beijing Engineering Department, said that the actual construction time is less than 30 days after the date of Saturday and Sunday, and it will definitely not be completed.

Ready of materials and drawings

Before entering the renovation, you must first determine the cabinet and bathroom products, and the tiles laid in the home, also set the model, size, and paving method. Otherwise, the size of the cabinet is not fixed, the bathroom is a shower room or the bathtub is not fixed, there is no certain line for the hydropower transformation.

Hint: If you want to decorate your new home, there is no clear expectation. It is recommended to leave at least a week or so to prepare materials and decoration drawings, so that the construction period will be delayed, and the possibility of completion by the year is greatly reduced.

Main materials must be prepared

The biggest problem of rushing to work before the year was the coordination of the main materials. For example, sometimes the bricks were not enough, and there were a few pieces. The situation may not be adjusted before the goods, or the transfer was delayed. Therefore, when the materials are purchased, they should be fully prepared, because some products such as cabinets, wooden doors, etc., although the installation is at the end, the processing cycle is not short.

Tip: The processing cycle of most cabinets is about 45 days, and the wooden doors take about 15-20 days from production to installation. Therefore, at the beginning of the renovation, cabinet manufacturers and wooden door manufacturers should go to the door for measurement. Consumers can ask the other party to expedite work and shorten the processing cycle. When decorating, we must not only supervise the decoration workers at the site, but also urge the manufacturers of this part of the products.

Work progress

1-7 days: change the location of the water and electricity

Before entering the renovation, you must fully communicate with the decoration company and ask the other party to provide hydropower transformation drawings that are clear and meet your needs. For example, the location of the reserved switch socket must take into account the placement of the furniture in the future, to ensure the convenience of use, do not appear after the decoration, the wardrobe, bookcase bought back, blocking the switch socket. Waterway renovation should consider whether the bathroom is a shower room or a bathtub. Also consider the location of the future washing machine, the faucet of the mop pool, and the hardware of the towel rack, tissue box, etc., to avoid installing the damaged pipe inside the wall. If the water and electricity are not changed much, it may be completed in about 5 days. It may take about 10 days to change more.

Tip: After the hydropower transformation is completed, the decoration company will produce another hydropower drawing. If you have the conditions, it is best to use a digital camera to take the entire transformation situation down, for future renovation or maintenance.

8-22 days: tile wall tile paving time forward

After the completion of the hydropower transformation, it will immediately enter the bricklayer stage, including leveling, waterproofing, tiling, etc. Among them, especially the wall tiles of kitchens and bathrooms must be pushed forward. Because the wall tiles of the kitchen are not finished, it is impossible to re-measure the cabinets. Without specific dimensional data, cabinet manufacturers cannot produce them. After the bathroom floor has been waterproofed, it is necessary to do a 24-hour water shut-off test to ensure that there is no water leakage and then tile.

Tip: Most people in the living room, bedroom and other spaces will choose the floor. If you want to lay the floor, after the ground leveling, it will take about 15 days, and the long time will be put in about 30 days. After drying, the floor can be installed.

23-32 days: Oilers try to cross the bricklayer

Apply the paint on the top of the wall. Use a week to put the putty, then put it for 2-3 days, then sandpaper and paint. Because the bricklayer is likely to be more than 15 days, it is recommended to carry out the cross-operation, that is, while the bricklayer is doing it, the oiler also enters the field to prepare or start the renovation, such as starting to put the putty on the wall.

Tip: When paving the floor tiles, because the tiles are not dry, even if the paving is finished, it needs to be maintained for about 2 days. During this period, the ground can't step on, and the oil workers must stop. In addition, in the process of cross-operation with bricklayers, we must pay attention to coordination, otherwise not only the construction site is a mess, but also easy to cause mutual pollution, but affect the construction progress and quality.

33-40 days: product entry follow-up product attention details

The work of the oilers has been completed, and 90% of the work on the site has been completed. At this time, the previously selected cabinets, wooden doors, lamps and other products need to be installed. Among them, the installation of cabinets is the most troublesome. Some cabinet cabinets and countertops are delivered at one time, while others are delivered to the cabinet first. The countertops arrive around the week. If the coordination is not good, it is likely to delay the construction period. Therefore, it is recommended that the consumer inform the cabinet installer to install it during the oiler construction.

After the wooden door is delivered to the site, if the door opening is not the same size and the door opening is not square, the wooden door measuring worker needs to communicate with the home improvement worker so that the home improvement worker can handle it according to the corresponding size.

Tip: The family who installs the floor should also prepare the door stone, solid wood strip or copper strip in advance at the intersection of the floor and the entrance door and the balcony, so that the workers can do the processing of the junction. In addition, it will take about 3 days to install small items such as toilets, bathtubs, lamps, switch panels, etc. The basic decoration is completed.

â–  Tips

Do not leave bricklayer work

If you want to leave part of the construction after the year, it is recommended that the oil retainers do not leave bricklayers. Because the bricklayer has a long time, and it is not recommended to do it separately. For example, if there is no one-time paste, if the interval is about one month, the two paving may cause the cement mortar to shrink the proportion of the brick, so that the bricks in different periods will have different heights, and even there will be Partial chromatic aberration.

After the year, the paint does not have much influence. Even the last layer of putty is not scraped. It is fine for a while. Bricklayers can also finish a single room and lay out other spaces later.

Cross-year is good for problem exposure

The renovation of the New Year's Eve should also be properly handled at the construction site during the Spring Festival. It is recommended to turn off the power and remove flammable and explosive materials such as paint. In addition to the more ventilated when the weather is fine, you can also put a basin of water in each room to ensure the humidity in the room. The New Year's project is not a bad thing for home decoration, which is conducive to early exposure and repair of renovation problems. For example, the cracking phenomenon that often occurs after the decoration, after nearly one month of the Spring Festival holiday, may appear in advance, and the construction workers can just repair it after the year. After the patching, the possibility of recurring problems is much lower.

Decoration Guide: Hu Zengguang, Director of Industry Decoration Engineering; Liu Yanjun, Manager of Yuanzhou Decoration Beijing Engineering Department

Beijing News reporter Li Ling

HDPE black corrugated spiral Plastic Pipe for prestressing

 

1. Type: Plastic(HDPE) Ducts  

2. Shape: Flat and Round

3. Diameter: from 46 mm to 140mm.

4. Application:  prestressed concrete structure, such as the large span railway and highway, bridge,  crane girders, rock-soil anchoring engineering, multi-floor industrial plant, coal, sports venues, etc 

5. Professional services: 1x7 days 24 hours service online, We can make different thickness and length for the customer 

6. Samples: We are free to provide you sample for your check


Company information

Brief Introduction of Boya:

Established in 2002, Zhejiang Boya Com-tech Co., Ltd. The company is located in Zhejiang Quzhou, and covers an area of 16000 square meters and has around 50 staff members,is a company specialized in manufacturing the new traffic communication pipe and drainage material and . we enjoy convenient access to major transportation networks. Furthermore, all our products are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. The company has passed ISO9001-2008 quality management system certification, ISO 14001:2004 Environment Management System Certification, all products has passed the national provincial detection test.

The main products of BoYa include PVC/PE cable protection pipe, PVC/HDPE perforated plastic pipe ,PVC/HDPE perforated plastic Corrugated Pipe, Plastic / metal corrugated ducts for prestressed concrete , The geotextile material,Geosynthetics for waterproofing and drainage.

we are enjoying good reputation among clients at home or abroad by timely supply, credible quality and sincere service.

If you are interested in any of our products, or wish to place a customized order, please contact us. We will do our best to meet your needs.    

Pre-stressed Plastic Corrugated Pipe

Large Diameter Pvc Pipe Corrugated Pipe,Prestressed Concrete Steel Strand Pipe,Circular Plastic Corrugated Pipe/Tube

ZHEJIANG BOYA COMTECH CO.,LTD , https://www.zjbytx.com