Embossing 304 Stainless Steel Coil

Model NO.: stw 095
Stock: Stock
Grade: 201,304,316,316L
Width: 10 ,30,40, 60,80,914, 1000, 1200, 1219, 1220, 1250
Base Material: Galvanized or Gavalume, Steel
Thickness: 0.14mm to 1.5mm
Zinc Coating: 40-150GSM
Length: up to The Thickness
Lacquer: Top Side15-25 Micro,Back Side 5 Micro
Surface: Passivation Unoiled Free Spangle Passivated
Trademark: STW or OEM
Transport Package: Export Seaworthy Packing
Specification: According to Your Requirement
Origin: Hangzhou, Zhejiang Province, China
HS Code: 73072900
product name 201,304,316 stainless steel 
coil weight 4-8 tons
Edge treatment Mill edge 
Technical treatment Bright annealed ,flatting ,
Surface treatment Annealed ,bright finishe,
Specifications;
1. 201,304,316 Stainless steel available.
2. Coil weight: 4-8 tons per coil
3. Edge treatment: Mill edge or cut edge.
4. Technical treatment: Bright annealed, flatting, cold harden.
5. Surface treatment: Annealed, bright finish, dull/bright finish, slit edge.

6.. Delivery terms: FOB / C&R / CIF
7. Supply Ability: 30000MT/month
8. Application: The construction industry: The roof structure, keel, grill, Clapboard, ceilings, fire shutter doors, etc; The light industry, the Automobile, agriculture, animal husbandry, fishery, casing of household Electronic application, civilian smoke stack, etc.
9. Delivery time: Within 30 days after the receipt of L/C or Signed the contract or according to customer's requirement.
Special design available according to requirement; Anti-corrosion And high-temperature resistant with black painting; All the production process Are made under the ISO9001: 2000 strictly



Package: Sea worthy Export Packing Standard export and seaworthy packing. (waterproof paper and metal sheet protection with fluted rings at inner and outer edges, 4 eye bands and 4 circumferential bands fasten the coil)


Q&A Acceptable payment term and way? T/T, L/C, T/T + L/C, D/P
Q&A Acceptable price term FOB CNF CIF DDU CPT
Q&A Do you accept OA payment terms? Yes, sure, but it normally depending on the order value
Q&A Do you have QC team? Yeah, sure, our QC team is very important, they will keep the quality control for our products.
Q&A What is the validity of your quotation? Normally 7 days.
Q&A What is your advantage?
24 hour quick response /Customer oriented/ Credit foremost/ Top quality Excellent
Q&A What is your acceptable payment term? TT, LC, OA etc


Q&A Why to Choose us?

· ISO System. SGS and BV from third party.

· Finished Product Inventory-More Than 50000 Tons.

· Raw Material inventory -Over 80000 Mertic Tons.

· Shipment of stainless steel coil -More than 50 countries worldwide.

· We have the most convenient transport and prompt delivery.

· We offer competitive price with best service.

· We have high technical production line with top quality products.

· We have win high reputation based on best quality products.

Hitachi Elevator Spare Parts

Hitachi Elevator Spare Parts, Hitachi Elevator Parts


Hitachi has been developing and manufacturing elevators and escalators for about 90 years. Social demands on elevators and escalators changed dramatically over time: faster, larger, and barrier-free and required.

History of Hitachi's Elevator and Escalator Business

  • 1924Lift manufacturing at the Kameido plant
  • 1932First elevator delivered (to Tokyo Electric Power)
  • 1937First escalator delivered (to Osaka Railway Department Store)
  • 1956Hitachi Building Services Co., Ltd. founded (currently known as Hitachi Building Systems Co., Ltd.)
  • 1966Hitachi Elevator Engineering Co ., (Hong Kong) Ltd. founded in Hong Kong
  • 1967Construction of an elevator research tower in the Mito plant completed (90m in height)
  • 1968300m ⁄ minute ultra high speed elevator delivered to the Kasumigaseki Building, Japan's first skyscraper
  • 1972Hitachi Elevator Engineering (Singapore) Pte. Ltd. founded in Singapore
  • 1974Delivery of 540m ⁄ minute elevators to skyscrapers in Shinjuku
  • 1987Hitachi Mito Engineering Co., Ltd. founded
  • 1991Siam-Hitachi Elevator Co., Ltd. Founded in Thailand
  • 1998Three affiliated companies in China merged to found Guangzhou Hitachi Elevator Co., Ltd.
  • 2003Opened Hitachi Building Solution Lab
  • 2007Guangzhou Hitachi Elevator Co., Ltd. renamed to Hitachi Elevator (China) Co., Ltd.
  • 2008Hitachi Lift India Pvt. Ltd. foundedDelivered the world's highest class ultra fast double deck elevators to the Shanghai World Financial Center
  • 2009Introduction of the Company systems leads to the establishment of the Urban Planning and Development Systems Company
  • 2010Completed elevator research tower [G1TOWER" (213m in height) for Mito WorksFounded Hitachi Elevator Asia Pte. Ltd. as a general elevators and escalators business company for the Southeast Asia, India, and Middle East regionsCompleted elevator research tower (172m in height) for Hitachi Elevator (Shanghai) Co. Ltd.
  • 2011Founded Hitachi Elevator Philippines CorporationDelivered 600m ⁄ minute elevators to the Al Hamra Mixed-Use Complex in Kuwait.


Hitachi Elevator Spare Parts, Hitachi Elevator Parts

CEP Elevator Products ( China ) Co., Ltd. , https://www.china-elevators.com