Choose a good decoration company or decoration construction team is good

With the continued hot weather in the real estate industry, decoration has gradually developed. The construction team has been blooming like bamboo shoots. The construction team is the role of real work in the decoration. It is the person who has the closest relationship with the quality of house decoration. Whether it is clear package, half package or all-inclusive package, the choice of decoration construction team is indispensable. Therefore, the choice of decoration construction team occupies a crucial position in the renovation process. For the owners who choose to decorate the company, they should not overlook the inspection of the decoration construction team.

Decoration construction team price

Basic engineering

1. Playing wall tiles 25/m2 bag waste cleaning

2. Ground cement mortar leveling 25/m2 concrete cement sand

3. Building wall 95/m2 package material cement river sand light brick

Hydropower Project

1. Intake pipe transformation 35/m PP-R pipe fittings elbow machine welding (without faucet)

2. Circuit modification 35/m package material line tube bottom box wire (Jinlong Yu brand 2,5 - 4 square without switch socket)

3. Telephone/television broadband line 35/m bag material line bottom line (excluding socket)

4. Waterproof and moisture-proof 30/m2 package material waterproof agent (panther card) brush 3 times

Ceiling ceiling project

1. Gypsum board ceiling (flat) 100/m2 package wood keel gypsum board accessories (without lamps)

2. Modeling top 120/m2 package wood keel 9 PCT board 5 PCT board (without lamps)

3. Partial shape Top 110 m Substrates wood keel gypsum board 9 PCT board (without lamps)

4. Aluminum buckle ceiling 110/m2 package light steel keel aluminum buckle sideband (excluding lamps)

5. Plaster line paste 15m bag line gypsum line gypsum powder glue accessories

Ground Engineering

1. Wall tile paving 45/m2 bag material cement river sand (without tiles)

2. Door stone paving 20/block cement river sand (without threshold stone)

3. The foot line lays 15/m to cover cement river sand (without foot line)

Wall engineering

1. The wall batch brush 26/m2 wall 3 times scraping and polishing the flattening brush 3 times latex paint (Duluxe side and bottom side)

2. Culture stone hanging paste 50-60/m2 package material cement river sand construction glue (without culture stone)

Door and Window Engineering

1. Door cover + door 400 + 750 / set of materials wood core panel panels solid wood door line paint

2. Window 350/ package materials wood core panel solid wood window line paint (excluding marble countertops)

Note: This price is for reference only! Due to geographical differences, of course, the price will be different. For more details on the prices, please refer to the local distributors!

  

How to choose a good decoration construction team

First, look at the offer

The quotation is the most important part of the decoration. The quotation comes from the cost, materials and technology used in the decoration project. That is to say, the price of a quotation and the price of the selected material, the difficulty of the construction process, and the amount of employment are not It's open. The decoration quotation on the market can be roughly divided into four kinds of quotation, the lowest is the guerrillas, the second is the company affiliated with the company, and the second is the mid-level company. The decoration company of the famous brand has the highest degree of publicity. Of course, the company must consider the company's consumption and profits. The guerrillas also have to consider the wages of workers. No matter what grade of construction party is chosen, it is necessary to roughly understand the quotation of this grade, as long as it complies with the law.

Before the signing of the contract, all construction projects must be completed. Once the items have been missed, they will not be able to speak later and will be very passive. There are six aspects that are most easily lost in the decoration industry: 1. Water circuit modification, 2. Substrate processing, 3. Waterproofing, 4. Ground leveling. 5, stand up tube, 6, baseboard. These items are often not reported by the construction company's total price, but the package unit price, and the amount of the project is uncertain, the purpose is to lay the foundation for the next addition.

In particular, the transformation of the water circuit is only reported as a unit price, and the amount of work is not reported. During the construction, the hands and feet are released. Arbitrary winding, rerouting, and reporting of imaginary numbers are numerous. There are many such examples. One customer is called Lan Qing. The decoration is 17,000 yuan, the hydropower reform is 7,000 yuan, and the Xi Erqi one owner is 90,000 yuan. The construction team's water circuit transformation will be 90,000 yuan. This is the reason for not confirming the amount of work. So say: Since the design is completed, the amount of engineering has been positioned, why not report it out? Why do you want to be calculated according to the actual happen? In the end this according to the actual occurrence who is the final say? To ease the decoration or put all the decoration The project is clearly clear. It is very necessary to have some trouble before the renovation. We should do our utmost to sign the project without any increase or decrease, leaving no tail at all. When the troubles of the later period are gone, there are few or very few.

Second, look at the scene

Look at the scene mainly divided into five areas: health conditions, safety measures, material yards, workers accommodation, workers quality.

On-site hygiene is one of the basic qualities of the construction workers. The site should be clean, sanitary, not allowed to have cigarette butts, rubbish, and should be cleaned three times a day on the construction site, and must be on site before, during lunch break, and after work. A thorough cleaning was performed and all the decoration rubbish was cleared on the same day. All the decorative materials should be placed in order, and at least two fire extinguishers should be placed on the construction site as fire safety measures. Construction workers are not allowed on-site food and accommodation, due to the progress of the progress of the owner's license, can not open fire cooking, to bring their own toilet, absolutely no longer allowed to use the bathroom toilet.

Third, look at the material

To see if the materials used by the construction team on the site are excellent environmental protection materials. For example: cement is usually used cement drill 32.5, sand for the sand, putty for easy to flat or wall lining, the sheet is not formaldehyde-free, wall paint is not brand-name, paint is not polyester, etc. . There are also wires for the construction party to buy the auxiliary materials, generally Kunlun's, the wire casing is not the thickness of the national standard 1.5mm, all the products that are pinched flat by hand.

Try the PPR tube for water supply again:

(1) Product Name: The product name of PP-R shall be "PP pipe for hot and cold water or "PP-R pipe for hot and cold water" and "PP-R" or ultra-fine particle modified polypropylene pipe (PP-R). PP-R cold water, PP-R hot water pipes, PP-E pipes, etc., all of which are pseudo-PP-R pipes.

(2) The product testing unit is a non-professional unit. The content of the test item does not conform to the content listed in the standard of the PP-R pipe. The product recommendation department or the product promotion department does not understand the PP-R product standard or the department without the PP-R standard. All issued certificates are pseudo-PP-R.

(3) The density of pseudo PP-R is slightly larger than that of PP-R.

(4) The PP-R tube is matte white or other colors, and the pseudo PP-R tube is bright or colorful.

(5) The PP-R tube is completely opaque, and the pseudo PP-R tube is slightly translucent or semi-transparent.

(6) The PP-R tube feels soft, and the fake PP-R tube feels smooth.

(7) The landing sound of PP-R pipe is dull, and the sound of the pseudo PP-R pipe is crisp.

Fourth, look at the tools

The on-site tools depend on what projects are underway. At the very least, the tools behind them should be available. At present, there are more and more electric construction tools, and the decoration design is very comprehensive. There are several kinds of work types such as water, electricity, oil, wood, and tile. So, what kind of tools should all kinds of tools have?

Water: pressure regulator, pipe-instrument, pipe wrench, mouthpiece, wrench, pipe cutter, stone cutter.

Electricity: universal table, shaking table, stone cutter, pliers, screwdriver, screwdriver, electric pen, three items of electricity meter, tube, soldering device.

Oil: air pump, spray gun, pen, roller, stirrer,

Wood: saws, planes, drills, air pumps, gas nail guns, squares, ink cartridges, moisture meters, rulers, cords, hand saws, hand planes, flat shovels, axes, chisels, bows, trimming machines, Screwdriver, ruler, box ruler.

Bricklayers: hammers, appraisals, large shovels, rubber hammers, sashes, rulers, rulers, trowels, trowels, square feet.

All these tools are available. The construction team is very professional. Generally speaking, a construction team that has not been working for several years does not have such strength.

  

Fifth, see technology

The construction technology of the construction team is the most critical link. How do you check the allocation of people? The layman is a more difficult task. Of course, for the inexperienced person, it is easy to see and why? Is there such a sentence? Words: Insiders look at the doorway, and laymen watch lively. This sentence is not false, the expert's attitude to work to see that he is the master who brought out, and his work is good or bad his skills a performance to show it, but how can customers see Come out!

Now let's tell you a few more stupid ways, but it is very clear and very practical. For example: when changing electricity, apply a wire-sleeve 1 - 1.5 meters to have a fixed point, the connection between the tube and the junction box to use the lock mother, the pipe and the pipe to connect with the pipe to add PVC plastic, turn to Turn the elbow bend around the elbow, and do not use elbows. There must be no more than two corners of the sleeve between the junction box and the junction box. The capacity of the sleeve is less than 60%. Leave 40% of the space to ensure that the altered wire can be replaced and the wire used to separate.

Six, see the agreement

The home decoration contract was originally very fair, but it was the protection of the decoration business from the payment method that was very unfavorable to consumers. Often, the project will not be completed in the medium term. The owner will have to pay 95% of the construction money. Later on, he will only be led by the construction team and led the construction industry to talk about the payment method to fully protect his interests.

After these six aspects of the investigation, if the owners and the construction team communicate if they can feel, then you can choose this team to decorate your home. However, there are some considerations in the decoration process worthy of the attention of the owners, Xiao Bian now for the owners to provide a few points for the attention of the construction team.

1. It is necessary to design and re-start the project first. It is necessary to order the project to be completed and find the decoration construction team.

2. Identify the construction team from the beginning and remember to replace the renovation construction team halfway.

Your own decoration is only your own ability to check it out. The shortest way to choose a construction team is to look at the installed site and see the level of construction. Second is to find out which workers are satisfied with their own livelihood. Select the construction team to designate the workers. The mobility of the workers in the decoration is very large. When the decoration, it is required to use this as a standard, and the quality can be guaranteed.

3, regardless of whether it is a large company or a small construction team should always see the site

No matter what kind of construction party you choose, you should look at the construction site more often than you do. Do not completely expect construction. Regardless of whether it is a large company or a small construction team, many problems in construction are unavoidable. Only the owners can go to the construction site every day to see if they find problems and solve them in time. Because there are some problems that do not belong to quality accidents, the owners communicate with the construction team. Problems sometimes appear to be such problems. The construction team is irresponsible.

If the mistakes in the decoration are not quality issues, it is difficult to solve. Some questions, if workers can consider it is impossible for you, don't expect the foreman to worry about you. People have to work hard to pick them up. Usually, they all open several sites at the same time. It is also not possible for the supervisor to keep an eye on your home every day. It is not as good for him to stare at him. The supervisor can only focus on the construction quality, and some details cannot be managed.

4, timely acceptance of the decoration, found that the problem is solved in time

If the time and effort allow it, it is best for the owner to go to the site once a day, so that problems can be solved in a timely manner. If the last problem does not come out, there will be great contradictions. The dispute with the construction team will be detrimental to both parties. In the process of renovation, it is inevitable that some places will not be considered in advance. If you find that you are unsatisfied, you must negotiate with the workers and correct it in time. Don't care about the money. You can exchange money for a good mood in the future. It is still worthwhile.

5. Run-in with the decoration workers

In the renovation, it is very important for the owners and workers to work with each other. The industry mainly works closely with the workers, and the workers have a good mood to make a good living. If the owners and workers are in conflict, the workers' skills will not do well for you. The current workers’ wages are higher than before, but the level of work is getting lower and lower. This is mainly because current workers are hard to find, especially good workers. Many people now have quality problems in construction, not because of their technical skills but their quality.

Editing summary: On how to choose a good decoration construction team, today I introduced here. The decoration project is good or bad, and the decoration worker has a very important relationship, so the owners must pick a good decoration workers, according to their own knowledge to understand, choose an excellent decoration construction team, so that smooth decoration!

Decoration decoration company decoration company decoration company which is good decoration company ranking decoration company decoration construction

Chameleon Prepainted Steel /Aluminum Coil

Chameleon Prepainted Steel Coil,Chameleon Prepainted Aluminum Coil,Chameleon Ppal Coils,Chameleon Coated Wall Panel

Shandong Wofeng New Material Co., Ltd. , https://www.wofengcoil.com