Kitchen and ceiling installation sequence kitchen ceiling tips

The ceiling of the kitchen and bathroom is an important part of the home decoration. The ceiling of the kitchen and bathroom not only has the functions of insulation, heat insulation, sound absorption, etc., but also has the effect of beautification. Due to the differences in the regional environment, the selection of ceiling materials will also be different. Now the new kitchen and toilet ceiling decoration materials are gypsum board, aluminum buckle board, aluminum plastic board, pvc plastic buckle board, fire board, soft film ceiling and so on. Next Xiaobian introduced kitchen and toilet ceiling installation procedures and kitchen ceilings.

Kitchen ceiling installation order

1, the line

According to the horizontal line of the floor elevation, use the vertical vector of the ruler to reach the design elevation of the ceiling, play the position line of the keel on the top plate, and bomb the horizontal line of the elevation of the ceiling on the wall.

2, install the main keel boom

After elevating the horizontal elevation line of the ceiling and the main keel position line, the elevation of the lower end of the boom is determined. According to the position of the main keel and the spacing between the hangers, one end of the suspension rod without bolts is fixed under the floor with an expansion bolt; the boom is used for 6 m. Reinforced steel (8mm flat steel).

3, install the main keel

Fit the suspender nut and pre-mark the pendant on the main keel. Put the main keel of the assembled pendant into the corresponding hanger bolt according to the position of the splitter wire, and tighten the nut to match the main keel. Fit the fittings, pull the wire to adjust the elevation and straight, attach the main keel to the installation hole, set and connect the fastening.

4, install sub keel

According to the already subminded sub keel line, the card is placed with secondary keel triangles, and wooden keel is used. The spacing between the secondary keels is 600mm. The main keel spacing according to the design will be used to suspend the secondary keel through the triangle pendant. On the keel; When the length of the secondary keel needs multiple continuous extensions, use the secondary keel to connect the secondary keel while connecting, straighten and fix it.

5, install the side aluminum bar

The specification of the aluminum strip is: 25mm*25mm. The elevation of the ceiling is required to fix the aluminum strip around the wall with cement nails.

6, install the aluminum buckle board

When installing the ceiling aluminum buckle plate, press lightly in the order of the flanges and place the two sides of the square plate completely into the secondary keel, and then push tightly. Strictly prohibit loading and unloading; and adjust the side aluminum strips to straighten out the fixed side aluminum plates. According to the design requirements, 600mm*600mm punched aluminum gusset plate is used for the ceiling of the project.

7, install lamps and vents

According to the ceiling plan layout, layout lamps and vents; installation of aluminum buckle plate, according to the size of lamps and vents to open holes, install lamps and vents.

Kitchen and ceiling techniques

1, do not drill too deep

In addition, it is worth reminding that the key to kitchen and bathroom ceilings is to control the measurement during the construction process, that is, when drilling fixed holes, do not drill too deep. In the past construction, there was such a case. Because the drilling is too deep, the original waterproof capacity may be damaged, resulting in endless troubles. Therefore, it is recommended to keep 3-4 centimeters in diameter when drilling.

2, the correct installation sequence can reduce vibration

The correct kitchen and bathroom ceiling installation sequence can reduce unnecessary vibrations. The correct installation sequence in the bathroom is to install Yuba and exhaust fans first, and then do the ceiling. Do not install exhaust fan or bathroom heater directly on the aluminum gusset plate with screws. You can use the expansion bolts to hang directly on the concrete on the top; if the exhaust hose of the exhaust fan is longer, (more than 1 meter), it is best to let workers It is fixed on the top. Otherwise, the exhaust pipe will vibrate when the exhaust fan is turned on. The fixing method is very simple. It only needs to use scotch tape to fix it.

The correct order for the installation of kitchen ceilings should be to first fix the hood of the hood and the flue, and to select the location where the hood is to be installed at the other end, and to buy the lights used in the kitchen, but do not need to install first. Then install the ceiling, then install the lights, it is best not to install large lamps directly on the ceiling.

3, according to the construction plan will be arranged in order of color

When installing the keel, the direction of the keel should be determined according to the design trend of the ceiling measurement construction drawing. After the determination, the keel distance and punching point should be marked on the roof, and the electric hammer should be used for drilling. The depth of punching should not exceed 4 cm. Prevents the destruction of pre-embedded wire tubes in the wall. After the punch is ready, expand the matching inner bulge into the hole. According to the height of the corners, the galvanized copper wire saw is good, into the inner bulge, according to the length of the room to cut the keel, the keel is fixed on the copper wire with a nut. The laying of ceilings should also be based on the measurement of construction drawings, the shape of the plate, the order of colors arranged in order, row plate, the pinch plate should be tight and seamless between the corners, and to indicate the control line hole.

4, when the stacking of plates to be flat

The aluminum buckle plates, plastic steel plates or integrated ceilings and supporting keels and fittings purchased in kitchen ceilings shall meet the product quality requirements and must be inspected for bending deformation. In the process of transportation and stacking, the plates should be laid flat and not pressed, and high temperature and harmful substances should be avoided. When the keel is installed, it must be flat and the spacing deviation should be controlled within the allowable range. When installing, if the dimensions are deviated, it should be adjusted before inserting in order, and no hard insertion is required to prevent deformation.

Editor's summary: The installation sequence of ceilings for kitchens and kitchens and ceiling techniques for kitchens and kitchens are introduced here. I hope to help everyone. If you want to know more about yourself, you can follow the information on this site.

Kitchen and ceiling ceiling kitchen ceiling installation order

food grade Potassium Citrate is a generally used food additive. It can be used as sequestrant, stabilizer, or buffer.

Potassium Citrate

Potassium Citrate Food Additive,Potassium Citrate Food Grade,Potassium Citrate E332(ii),Cosmetic Grade Potassium Citrate

Jiangsu Kolod Food Ingredients Co., Ltd. , https://www.kolodchem.com