How to Accept Hydropower Project

The acceptance inspections of hydropower projects mainly include inspection during the construction process and inspection of the delivery. 1. During the construction process, check the processes that will have a serious impact on the entire process if the construction fails. It must be checked after it is completed. Such as the kitchen and bathroom waterproof, buried on the ground ... 80 after the small husband and wife wedding ceremony petty bourgeoisie mood reflects a member of the exclusive cash discount · Mediterranean style blue + white mosaic even for the home art young hot MOM 50,000 to create a two-house shop No. 1 cash discount coupons to warm this winter is not afraid of cold · small apartment mix and match new trends · 200,000 luxury to create 95 flat space · Dulux paint cost-effective large PK · TV wall small space large content of hydropower engineering Acceptance inspection mainly includes inspection during construction and inspection of delivery.

I. Inspection during construction

For those processes that will have a serious impact on the entire process if the construction fails, it must be checked after it is completed. Such as kitchen and bathroom waterproof, buried underground water and electricity pipelines, after the construction of the floor tiles found that water is not qualified, the wiring pipeline is not connected, plumbing pipeline is not connected or water leakage, it can only be reworked.

Second, inspection

1. The wire conduit should be unblocked, and the conduit wire should be drawn back and forth by hand. It should be able to twitch so that the damaged wire can be replaced later.

2. Check the socket wire sequence with the electric pen or socket detector. It must be left zero and right fire on the ground.

3. Check the switch wire sequence with the electric pen. The switch must control the fire wire.

4. Check the test button of the leakage protector or check the leakage protector with the socket detector. The operation must be flexible.

5, using the insulation resistance meter to detect the insulation resistance of the loop is not less than 0.5M ohms.

6, open the main valve, hand touch to the drainage pipe joints to be tight, no water leakage, drainage should be smooth.

Acceptance inspection must pay attention to the preservation of the water circuit construction drawings, and require the drawings and the actual to be consistent with each other, because the drawings are the basis for future maintenance, but now most owners ignore this.


Space effect map brick socket space switch paint home fashion small apartment bathroom waterproof bathroom door bathroom floor tile bathroom leak

BBQ Grill Mesh

BBQ Grill Mesh,Stainless Steel BBQ Grill Shelf,BBQ Grill Wire Mesh

Xinlong Wire Mesh Manufacture Co., Ltd. , http://www.hebwiremesh.com