Decoration Budget Form 2

project
Quantity
unit price
Calculation
Remarks (suitable for brand)
Main materials:
One. Ground
Laminate flooring
The low end of the 30-70 square, the middle of the 80-110 square, good 120-150 square, the best
Hundreds. Calculation method for the size of ground area: 0.9 in the set is the actual area used, (excluding the balcony),
1-3% loss.
wooden floor
It is not recommended to use wood below 200. In general, the special price for these letters is 250 or so. There are more than 300 medium, and thousands are good.
1-3% loss.
Living room brick
The low end of the 20-80 square, the middle of the 80 - 150 square, high-end 160 - 280 square, a good 400 or more, sometimes a good brand of special tiles in the suit worthy of a good s Choice.
When calculating this, it is necessary to calculate the cost of the baseboard at the same time. The loss must be calculated when calculating any brick, the more complex the loss is.
Balcony brick (or wood)
Recommend the use of cheap, generally 20.30 can, it is best not to exceed 60.70, preservative more expensive, it seems to be voted 100-200 a square.
Cabinet wall brick
Small bricks are more expensive, and diagonal sticking money is also more expensive. Some require antique bricks but the budget is tight. Large bricks can be used to solve the problem. Low-grade 10-40, mid-range 40-100, high-grade 100-300, the calculation is generally 4 times or more of the ground area. Sometimes brand-name specials are a better choice when they are affordable.
After the cabinet can be posted, save the province. Do not reduce this point of the budget.
Tiles, waistline
There is no standard to count yourself.
Ladder steps, stairs
There is no standard to count yourself.
two. kitchen
cupboard
Not specific budget, according to the size and requirements of the house, brand, configuration, modeling, generally 2000-8000, high-end tens of thousands or even hundreds of thousands.
Kitchen Appliances
Smoke machine
Chinese is the cheapest, but also look at the brand.
kitchen
Disinfection cabinet
Kitchen is smaller or budget is not recommended
Water heater
According to the function, brand, capacity has a larger spread.
Kitchen hardware
Including a variety of pull blue, pendants, etc., generally 300-2000
Microwave oven
Basic decoration does not budget
oven
I feel useless
Same as above
Juice machine
It is best to send shopping or points for
Same as above
Pots and pans
Usually do not have more points, then go to change
Same as above
three. Bathroom
Toilet
200-600 low-end, 700-2000 mid-range,
Upscale 2000-5000, good tens of thousands, split toilets cheaper, but I personally do not recommend the use. General brand name special offer is the first choice of sanitary products.
è¹² + + water tank
At present, the number of flush valves is still low, the low-end 100-300, the mid-range 300-600, high-end 600-1000.
Bathtub (wooden barrel)
Pressure can be no skirt 400-1500, steel plate or the United States cast without skirts 800-2000, cast iron 1500-4500, pressure can be a single skirt without hardware 600-2000, including hardware 1200-3500, multi-skirt 1200-3500. Massage 3000-10000. Wooden barrel 1000-2500.
shower room
Simple 700-2500, 1500-6000 with hardware function. I personally think this is useless unless the location is limited.
Integral glass partition
Around 1000, personally think it is useless.
Glass or wall half partition or shower curtain
It is recommended to use this method, the general cost is 200-500.
Basin
There are three ways: 1. Pedestal basin. 2. Buy yourself a pot, 3. a set of. Pedestal basin 100-600. Do it yourself around 500-1200. A set of 500-4000 sets.
Bathroom accessories
Generally 200-800 cases without mirrors, pots with fewer sets.
Faucet
Moen's average of 300 counts, SLD, nine animal husbandry , small poplar, etc. according to an average of 200 counts, a cheaper average of 60-120 count, the German Hans or European faucet according to an average of 800 - 1500 count. Pay attention to calculate the shower, more expensive with lotus.
Sink + faucet
Generally like Frank, Olin, Moen's special price is between 800-1200, the normal price between 1000-3000, generally 200-300.
three. Category
Original wood door
3000-10000 a fan
Solid Wood Door
1000-2000 a fan
Process door, molded door
450 --- 800 fan
Solid wood composite door
700-1000 a fan
Cupboard with glass door
The expensive points with glass are generally 600-800. Plastic-steel doors and aluminum-alloy doors are cheaper. Generally, steel is 200 yuan and aluminum alloy is 400 yuan. However, if the aluminum alloy is to be packaged, it is almost the same. It is not necessary to make solid wood with glass door. If you want to do solid wood paint, you can choose solid wood composite door
Hardware (door locks, hinges, door stoppers)
Low-grade 25-50, mid-range 60-150, high-end 150-500.
four. Cabinet ceiling
Plastic steel plate
30-70 square
Aluminum plate
50-150 square
Moisture-proof gypsum board
35-60 square
Installation fee and inside corner
300-1000
Fives. Switching appliances
Type 118
Low-grade 15-30 square meters, mid-range 30-60 square meters, high-grade 70-120 square meters.
Type 86
Low-grade 20-40 a square, mid-range 40-150 a square, high-grade 150--500 a square
Yuba
Lantern
Ceiling light
light source
Copper spotlight
ventilator
6. Stone
Bay window, threshold stone. Cheap 70-120 square meters, 120-300 square meters in the block, expensive 300-1000 square meters, including expenses.
7. Door cover, window cover
Entry door is to pack, other to not necessarily, usually 45-100 meters.
8. Main material other miscellaneous items
Angle valve, high pressure pipe, floor drain
Soft trachea, sealant, hardware, etc.
9. Wallpaper
Low-grade 10-20 square, mid-range 20--80 square, high-grade 80--300 square.
Sticker wallpaper and costs
10. Curtains
11. Furniture
sofa
coffee table
bed
Dining table
Several sides
Side cabinet
Bucket cabinet
Bed (including nightstands)
Dresser
wardrobe
Outside the custom-made non-solid wood cabinet with 350--750 square feet, the home to do with the door generally 450 --- 900 a square, the outside of the solid wood to do the general 400-1000 a square, home to do the general 700 -- 1200 square feet, the general 300 - 3000 to buy finished products.
bookcase
Ibid, but there is no cabinet door to be reduced.
desk
Chair, Corner Pier
Leisure table
Wine cabinet decoration cabinet
TV cabinet
Flower stand
12. Electrical appliances
air conditioning
refrigerator
Color TV
washing machine
Other electrical appliances
13. Late accessories
Ornaments
Decoration
table lamp
flower
image
mattress
carpet
other
14. Other miscellaneous items
15. Change doors and windows
16. Dressings
one. Decorative company dressing dressing
Does not contain wood, can include simple ceiling, video wall, shoe cabinet. Small and medium-sized decoration companies: low: 180 - 230, mid-range: 240-290. High grade: 300-400. Large decoration company: mid-range: 270 ---350, high-grade: 350 - -450. Note that small house prices are higher, big houses are lower, but too much higher. If there are complex shapes or changes in the wall too much more expensive, wooden price reference wardrobe bookcase items.
two. Decoration team dressing
Does not contain wood, can include simple ceiling, video wall, shoe cabinet: low: 150 - 200, mid-range: 200-240. High grade: 240-280. Note that small house prices are higher, big houses are lower, but too much higher. If there are complex shapes or changes in the wall too much more expensive, wooden price reference wardrobe bookcase items.
three. Cleaner Workers
Low-grade 50-75 Mid-range 80-110 High-end 110-160 Wood without wardrobe
four. Casual workers
Please do not compare the cleansing price with the offer from the decorating company's decoration team, because people need to pay more, so they should be higher. In addition, the wages are not the same as under normal circumstances.
Hydropower (including late installation, gas)
8–18
Muddy water
The normal posts are 12-16, 30-45 small bricks, more expensive diagonal posts, leveling 4-6, and 40-60 guarantees. As for the backfilling of masonry, the application of nesting is to look at the scene.
Carpentry
This is based on modeling and calculations. It is not very good to say that about 80 to 140 working days (8 hours), prices are not the same in more than 8 hours.
painting
7-10 yuan, wood paint can not say, see how to do it.
mason
It is not very good to see how to fight the line nest and dismantle the wall. Generally speaking, if you work for 8 hours, it will be 60-100.
Hydropower materials
Not very good according to the square calculation, 60 or less: 25--60-one-square 60-80:20--55-one-square 80-120 20-55-one-square 120-150:20-50, and then calculate the way Not the same, these prices are more than just copper tubes
waterproof
20--1000 (excluding the terrace, roof garden) within 150 square feet
Woodworking and dressings
Not good, look square
Paints and dressings
1000 - 4500, 150 square meters without wood paint
Cement river sand
1000--3000,150 square
17. Dumping costs
18. Handling and fare
19. Ask people to eat
20. Ask for leave to be deducted from wages or amortize the cost of their own efforts.
21. Post-Environmental Governance Costs
22. It is a waste of cost or design error rework costs to buy something wrong.
23. Fees such as moving and slippers,
24. Cleaning and other expenses

Door prices Painted glass house Decorate kitchen decoration Picture Plasterboard Ceiling Ceiling Decoration partition Living room Living room Picture Living room sofa Picture living room Wine cabinet Living room ceiling Picture living room TV wall Picture partition Door wine cooler Partition floor Tile Glass table Glass dining table Kitchen glass Sliding door Function Sofa bed Wine Cabinets Cabinets High-end Curtains Kitchen Wall Tiles Partition Glass Doors Glass Door Lamps Glass Tiles Cabinet Doors Antique Flooring Glass Glass Furniture Bucket Cabinets Antique Tiles Perspex Anti-corrosion Wood Flower Stand Glass Cabinet Door Function Sofa Kitchen Cabinet Door

Loader Parts

Loader Parts,Track Loader Parts,Case Loader Parts,Skid Loader Parts

JINING SHANTE SONGZHENG CONSTRUCTION MACHINERY CO.LTD , https://www.sdkomatsuloaderparts.com