Decoration process and precautions read decoration here

Those who have not experienced renovations are difficult to form a specific understanding and understanding of the decoration. How to get to know the decoration? The most fundamental thing is to first know what the decoration process is and what points each process needs to pay attention to, which is what we are talking about today.

Renovation process and matters needing attention First, get admission ticket - apply for admission

In general, the formalities for the admission process require the original and photocopy of the ID card of the person in charge of the decoration team, the original and copy of the owner’s ID, a copy of the company’s business license, a copy of the construction company’s construction permit, and a decoration deposit. Of course, you need to specifically ask about the owner's house management office.

Decoration process and matters needing attention Second, draw a circle, split! The main demolition reform must be careful

Before the design, we must master the building's load-bearing structure and distinguish the removable part from the undetachable part. Under normal circumstances, in the implementation of unified property management of the district, in addition to the building's bearing walls, columns, all architectural components that affect the appearance of the building can not be changed, such as windows, balconies and so on. The wall-to-wall area can be calculated based on the floor plan of the house. There are various detailed data on the house. Remember that the amount of area that will be knocked against the wall before knocking on the wall is good. You must know that knocking the wall is based on the area.

Decoration process and matters needing attention Third, the sand cement to play - the bricklayer approach

After knocking on the wall, the garbage was cleared and the plasterer should enter the field. Puddlers are mainly responsible for masonry wall, batch ash, sporadic patching, tiling, waterproofing, ground leveling, and floor draining.

1. Cement mortar should be used for building walls and batches of ash. The only difference is that the ratio is different. Building wall and batch ash are the preparatory work for the slusher. After these two items are completed, the slushing trade unions first measure the actual area of ​​the wall and the batch of ash. Then he and the owner will replenish these dimensions.

2. Compared with brick walls with rounded corners, right-angled side wall tiles are prone to uneven or missing bricks after paving. It is recommended that high-quality products should be selected for right-angled side walls, and the investment in the economy should not be large. In case of situations, try to choose rounded wall tiles.

3 The construction requirements of the mosaic are more stringent. The walls should be plastered and leveled, and the pavement should be laid down from the top. The paving design of wall flowers and floor decoration lines should consider the arrangement of furniture and equipment to avoid obstruction and affect the space effect. Placing ceramic tiles in irregular spaces, the seams of bricks are prone to clutter, and it is necessary to control their effect on space effects.

4 It is best for one person to paste a tile in a room. If two people do it, the effect may differ depending on the style.

5 In addition to the construction of the waterproofing project as required, after completion of the waterproofing construction, a water storage test shall be conducted. Pay attention to the moisture-proof and moisture-proof furniture in the wet room to be arranged in the dry space. When using the wooden furniture to make the kitchen and dining room partition, waterproof treatment must be done; close to the bathroom cabinet, kitchen cabinet wall cabinet furniture The back also needs to do moisture treatment.

Decoration process and matters needing attention Fourth, all the way cremation cut wire - hydropower reform began

Before the plastering and ashing, the plumbers entered the site for hydropower reform. The main tasks of hydropower reform are hydropower positioning, slotting, buried pipe and threading.

1 The first step of hydropower reform is the positioning of hydropower, which is based on the needs of users to determine the location of the switch sockets and the position of the waterway interface. The plumber should follow the position of switches, sockets, and taps to map the line to the user. clear. Moreover, we should pay attention to the principle of “taking water to the sky and electricity to the ground”. That is to say, the water pipes should go to the ceiling and the strong and weak electricity should go to the ground as far as possible, and the strong and weak electricity cannot cross each other and the parallel distance is greater than 30 centimeters.

2 The installation and design of the distribution box and information box must be considered for ease of use, concealment, and safety. It is also necessary to pay attention to the direct connection with the external main line; the electrical circuit cannot be hidden in the building's load-bearing wall or column.

3 The electrical circuit design of sockets, switches, and lamps must take into account the variability of the interior space, prepare for possible different space usage conditions, and reduce the barriers to re-planning design of some users during use, such as desks, decorative cabinets, The impact of the movement of electrical equipment on electricity use and water consumption should also be taken into consideration.

Decoration process

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

It is a new High Temperature Antioxidant with superior performance, it has good high thermal stability, outstanding anti-oxidation performance in high temperature, high oil solubility, and high compatibility with other additives. It`s widely used in high-grade ICE lubricants, heat conducting oil, high-temp. chain oil, hydraulic oil, Gear Oil, turbine oil and other industrial lubricant oil, all kinds of lubricant, grease and fuel oil, the general treat rate is 0.3-0.5%.

This product line includes: High Temperature Antioxidant Ester Phenolic Type T512, High Temperature Antioxidant Butyl Octyl Diphenylamine T534 and High Temperature Antioxidant p-p' Dinonyl Diphenylamine T536.


High Temperature Antioxidant 1


High Temperature Antioxidant 2


High Temperature Antioxidant

Phenolic Antioxidant,High Temperature Antioxidant,Amine High Temperature Antioxidant,Ester Phenolic Antioxidant

Zhengzhou Chorus Lubricant Additive Co.,Ltd. , https://www.cn-lubricantadditive.com