[new house acceptance cheats] wall inspection skills

New owners like to add new homes. Acceptance of new homes is the most important and indispensable step. However, most owners do not have a clear understanding of the methods and standards for acceptance of all aspects of housing. Next, Xiao Bian explains the new home acceptance skills - wall inspection.

New house acceptance wall inspection skills

1, empty wall inspection

Tap a wall with several layers of paper with a special steel needle hammer (10g) to check the hollowness of the wall. Check if there is empty drum on the wall, hit a wall with a wooden hammer or something, and the sound produced when you knock on the empty drum is not true and it is easy to hear it. Make a mark and fill it with putty during the renovation.

2, the wall leak check

To check if the wall is leaking, it is best to observe it on the second day after the rain falls before the house is turned over. Specially check the wall for water stains, especially for some gables, kitchen bathroom tops, exterior walls and other places. If there are water stains, there is leakage.

3, wall crack inspection

In addition to the seepage of water in the walls, there is a problem that the wall is cracked. General wall cracks are better checked.

4, Wall paint quality and wall surface inspection

When the ambient light is dark, use a high-power light bulb (200 watts) to illuminate. When the light is on, the wall ceiling is flat and it will be immediately seen through the shadow of light. If it is not flat, it must be replenished with putty paint; if it is partially painted (patched Over) will make a difference with the color of the wall.

5, check whether the wall is flat

Use a long ruler, etc., near the floor of the wall to check if the wall is flat.

6, the wall putty is waterproof check

Check the wall putty, whether it is waterproof putty, you can bring a bottle of mineral water, splash water on the wall, hand touch to see if there is mud on the hand, if not to prove that the wall of waterproof putty qualified.

7, vertical inspection of the wall

The national standard requirements for wall flatness and verticality are measured using a 2 meter ruler with errors within plus or minus 3 mm. The error in the verticality or flatness of the wall surface is large, and it has a great influence on the appearance of the later decoration. The error in the flatness and verticality of the wall surface will greatly affect the placement of the kicking feet, doors, and wardrobes in the later period.

8, the wall surface curing hair quality is poor, pull hair delamination cracking, peeling

Pulling hair is poorly cured and can be wiped off by hand!. . . Some kitchens and kitchens have poor quality of the wall coverings, and the sand content of the napped layer is too large. The collection layer can be used to wipe off the napped layer directly. This type of shorn handling can easily cause ceramic tile falling off in the later tiling process.

The above is a brief introduction for Xiaobian. If you want to know more related information, please continue to pay attention to Qijia Consulting. More exciting consultation, please stay tuned.

Living room glass partition wall balcony wall decoration attic bedroom partition wall model sofa wall background wall new house acceptance considerations

RUNDE speciallized in Bronze Fittings,covered end feed and solder type and the flange,bronze fittings.well known as yorkshiire bronze fittings,pegler bronze or gunmetal fittings as well as connex bronze fittings

Bronze Fittings

bronze fittings,Yorkshire bronze fittings,Pegler bronze fittings,gunmetal fittings

Taizhou Runde Company , https://www.smartfittings.com